This project consisted of the demolition of 13 existing timber piles, and 130 timber floats. In addition, the installation of 13 steel piles, an 80鈥� gangway and 100鈥� of low profile floats, and beach cleanup of concrete debris for mitigation.
Crew Members left to right; Josh (Operator), Aaron (Superintendent), Travis, (Mechanic) John, (Pile Driving Foreman), Craig (Pile Driving Foreman) and Rob (Pile Driving apprentice)
Craig, Rob and John - 麻豆传媒 Construction Crew Members