Clarks Point Breakwater Removal

ProjectClarks Point Breakwater Removal
Date11/04/2021 to 11/12/2021
Location4700 Fieldston Road Bellingham, WA 98225

Project Summary

The Clarks Point Breakwater Removal project entailed removal and disposal of rock breakwater, wood pier, concrete and metal piles, & timber stubs.